俄罗斯认证,GOST认证,eac认证 CUTR认证,俄罗斯标准认证集团 Certification Center JSC "Standard Group"  E-mail eac@cu-tr.org
服务热线:021-36411293
欧亚联盟卫生与医药注册法规部
上海经合工业设备检测有限公司
俄罗斯认证

欧亚联盟EAEU、俄罗斯、乌兹别克斯/哈萨克斯坦/白俄罗斯/乌克兰医疗器械和药品注册咨询服务

Eurasian Economic Union Russia Uzbekistan Kazakhstan Belarus Ukraine Medical Device and Drug Registration Consulting Services 

当前位置:
RTN认证,RTN许可,RTN Permit
来源: | 作者:pmtdf68fd | 发布时间: 2103天前 | 2924 次浏览 | 分享到:
RTN认证,RTN许可,RTN Permit

RTN认证,RTN许可,RTN Permit

History and main definitions

RTN Permit is the principal regulatory document that certifies safe operation of equipment on hazardous industrial sites.
 
The legal, economic and social basis for insurance of safe operation of hazardous industrial sites is identified in the Federal Law N°116-FZ issued on July 21, 1997. The Expertise of industrial safety is evoked as a compulsory measure in the safety insurance system of these sites. Federal Mine and Industrial Inspection supervised industrial safety in accordance with the Governmental Decree N°1540 issued on December 25, 1998, until 2004. The supervising role was taken over by the Federal Service of Ecological, Technological and Nuclear Supervision (RosTechNadzor or RTN) created according to the Presidential Decree N°314 issued on March 09, 2004 (taken into account the changes announced in the Decree N°649 issued on May 20, 2004).

Scope and products / equipment involved

Placing on the market of any technical device for the hazardous industrial site requiresthe implementation of industrial security expertise and the delivery of the Permit to use (RTN Permit).
 
The definition of hazardous industrial sites is given in Appendix No.1 of the Federal Law No. 116-FZ issued on July 07,1997.
In particular, the use of equipment in the areas / conditions listed below requires the receipt of the RTN Permit for this equipment:
  • receipt, use, processing, shaping, storage, transportation, disposal of hazardous materials such as:

flammable gases, fuels, explosives, toxic to living organisms, toxic to the environment
  • use of pressure equipment>0.07 MPa andtemperatures>115 °C

  • use oflifting equipment


  • obtaining fused metalsand derived alloys

  • mining works andore benefication

    RTN Permit Russia

Placing on the market:

To place products / equipment on the market, the manufacturer or its authorized agent must:
  • meet the requirements of the national industrial safety

  • apply the procedures for assessing operation safety

  • get the satisfactory industrial expertise reportand Permits and ensure that it is enclosed to the products.

In practice RTN permit is required at the moment of equipment placing on the market in the Russian territory, while th
e term of obtaining this documentis up to 6 months. 

How to get it and applicable procedures

Industrial safety Expertiseis the key document for obtaining theRTN Permit. It must be performed by an authorized
 body o nthe basis of documents provided by the Permit’s applicant. Satisfactory expert reports with the elements required by the paragraph No. 28 of Chapter II of RTN Decree No.112 issued on February 29, 2008 are given to the RTN authorities for approval and Permits delivery.
 
To prepare the file for obtaining the RTN Permit, the Permit’s applicant provides the following documents:
  • administrative information about the manufacturer and supplier of the equipment;

  • information file;

  • program and methods of testing equipment;

  • testing protocol;

  • act of corrective actions (if necessary);

  • conditions and requirements of safe operation;

  • technical maintenance procedures, troubleshooting and diagnostics.

The components of the file should allow the experts tocheck if the equipment has been designed in accordance with all measures of safe operation: these are the plans, drawings, material certificates,a cceptance testing for components etc. Depending on the type of equipment, other documents may be requested.

The duration and receipt of the RTN Permit:

Type of certificate
Validity
Time of receipt
Time of working out certification file
By exporter (standard procedure)
By us (accelerated procedure)
Permit RTN
Valid for one entry : a single shipment of a product or a batch of products
4-6 months*
1-6 months
1 months
Permit RTN
Valid 5 years for mass production
4-6 months*
1-6 months
1 months
 
*- the terms are calculated from the date of delivery of the complete technical file

RTN Permit

Our solutions :

  • Obtaining RTN permit;

  • Implementation of the industrial expertise;

  • Organization and implementation of the audit of the industrial site;

  • Preparation of technical passports for all types of equipment (pressure <0.7 bar; pressure devices >0.7bar, compressors, pumps, valves, piping, electrical equipment, etc.).

  • Drafting of pre-filled passports model ;

  • Verification of design notes;

  • Supervision of welding procedures;

  • Assistance to acceptance tests;

  • Compliance program and test methods;

  • Development of Conditions and safe operation requirements;

  • Formatting the information file.

Currently issuing the RTN Permits to use of technical devices on hazardous industrial sites is regulated by the Decree RTN N°112 issued on February 29, 2008.

联系我们:上海经合工业设备检测有限公司/俄罗斯EAC证机构中国代表处
电话:021-36411223   36411293
邮件:eac@cu-tr.org 
手机微信:18621862553